Frequent questions from property managers, PPEs, developers and architects
Professionals consulting us for the first time want to know how we respond, who executes and how the order and acceptance take place. We have gathered here the questions that come up in these exchanges.
In what form do you submit your offers?
If you provide a tender form or a schedule of items, we fill it in as it stands, without altering its structure. Without a document from you, we write our own quote, sorted by room and by type of work, with the quantities measured on the spot. The quantities thus remain verifiable, and two offers can be placed side by side without reprocessing.
Do you accept assignments limited to a single package?
Yes. A works supervisor may award us only the plastering and painting, or only the floor coverings. We then coordinate with the other companies on site according to the schedule the supervisor draws up. We simply point out the interfaces with the neighbouring packages, for example the state of the substrates we expect before laying a floor.
Can you take on a general contracting assignment?
Yes. In that case, we engage the partner companies for the packages we do not execute, we draw up the overall schedule and we are your sole contracting party for the works in the offer. The limit of the service is described package by package, so that there is no grey area between two trades.
Who are your partner companies?
They are companies from Geneva or the region with which we work on an ongoing basis, for electrical work, plumbing, heating, ventilation, joinery, windows, roofing and waterproofing. We give you their names on request. We choose them for the consistency of their work and their familiarity with occupied buildings.
How do you handle additional works?
Any work not included in the order is announced before execution, with a description and a supplementary offer. We wait for the client’s written approval, except for an urgent safety measure, which we report at once. Quantities actually executed are measured jointly when the item is paid by measurement.
Do you attend site meetings?
Yes. Our manager attends the meetings convened by the architect or the works supervisor and applies the decisions recorded in the minutes. Between two meetings, the manager remains reachable for questions of execution and passes the information on to our teams the same day.
How are tenants or co-owners informed?
We prepare a notice stating the nature of the works, the dates and any shut-offs. It is approved by the property manager or the administrator, then posted in the building or put in the letterboxes. For work inside dwellings, each occupant also receives a proposed appointment.
Who deals with permits?
When the owner has an architect, the architect deals with them. Otherwise, we prepare the building permit application file with a qualified agent, and the fees for this application are borne by the client. The site only starts after the permit has been issued.
How is access to the dwellings arranged?
Appointments are made with each occupant, directly or through the caretaker. When keys are entrusted to us, their handover and return are recorded. If an occupant is repeatedly absent, we inform the property manager, who decides what follows.
What happens to site waste?
It is sorted and removed to the channels provided for rubble, wood, metal and materials that need particular treatment. No waste is left in the building’s containers. In old buildings, materials that might contain hazardous substances are analysed by a laboratory before any removal, at the client’s request.
How does acceptance of the works take place?
We propose a date for a joint visit. Remarks are entered in the record with a date for making good, then cleared during a second visit if necessary. The end-of-site file, with the references of the colours and materials, is handed to you on that occasion.
Do you work outside the City of Geneva?
Yes, in the 45 municipalities of the canton. For a portfolio spread over several municipalities, we organise rounds of visits in order to group the properties of one sector. Access, parking and municipal noise rules are checked for each address.